Followmy.tv Keeps track of your current tv shows. Discover new tv shows, discuss and share them with your friends.

The This Old House Hour - 30x20 New York City; In with the New

After starting the day at nearby Tom's Restaurant, host Kevin O'Connor finds homeowners Kevin Costello and Karen Shen inspecting the new exterior paint job at the project house in Brooklyn. Inside, general contractor Tom Silva finds local builder Michael Streaman laying down new 5/16" white oak flooring in the parlor with two accent strips of cherry as a decorative border. Nearby in Red Hook, plaster contractor Stuart Sobczynski shows Kevin how he's replicating the plaster crown mouldings for the house, and later, the new mouldings are installed at the house. In the back yard, landscape designer/contractor Bob Reitmeyer shows Kevin the progress on a new retaining wall, and the brick patio that is going down in a herringbone pattern with a soldier course border. On the garden level, local millwork contractor Mitch Berlin installs new replacement windows on the back of the house. On the top level rental unit, a local spray foam insulation contractor has arrived to insulate the top of the building to keep the heat from escaping up and out—and just in time, as a snowstorm blankets Brooklyn.

Comments

No comments yet. Please login to be the first.
  • Awaiting 10 votes
  • Poor
  • Nothing special
  • Worth watching
  • Pretty cool
  • Awesome
  • Aired Feb 12, 2009
  • Episode 30x20
  • Show special No

Activity

Followers (4)